Saturday, February 28, 2026

Second day of production (did not work)

 

So today was our 2nd production day and well let's just say it did not go so well. We ran into two problems and basically we had to reschedule the day. So originally we had planned the production to be at 10:00 AM but a member of the grouo had a doctors appointment in the morning so we had to reschedule for later in the day around 3:30 PM and 4:00 PM. So we got to the shooting location around 4 and we got dressed and everything was ready. We started shooting but as soon as we started it started raining. We could not do the shots that we needed now because last time when we shot all the scenes were sunny and it was nice weather. If we did the shots today then it would have looked different and would have made the scene weird. The only shot we were able to get was the one inside the house and that took about 5-10 minutes. Overall, the production day went kind of wrong but the good thing is that we started editing the clips that we have so we dont get cramped with time. 




No comments:

Post a Comment

Final Projects

 CCR's  Aice Media Portfolio CCRS Opening https://drive.google.com/file/d/1bcPiiXPkIQevwnCZLoxopkBX-q7BmuZn/view